Over Rusty Rails's primary photo
  • Over Rusty Rails (2016)
  • Short | 40 min | Documentary, Short
Over Rusty Rails (2016)
Short | 40 min | Documentary, Short

The 50 Km Rotorua Branch Railway was opened on the 24th November 1893 and runs between Putararu and Rotorua. Construction was commenced by the Thames Valley and Rotorua Railway Company and was completed by the Public Works Department. The ...See moreThe 50 Km Rotorua Branch Railway was opened on the 24th November 1893 and runs between Putararu and Rotorua. Construction was commenced by the Thames Valley and Rotorua Railway Company and was completed by the Public Works Department. The last train to run on the line was a special excursion on the 24th February 2002 and since then the line became overgrown and many sleepers and track fastenings have been stolen. The Rotorua Ngongotaha Railway Trust secured a lease over the whole line in December of 2009 and have subsequently begun the onerous task of reinstating it to a mainline standard. This is a film on the life and times of the line. Written by Graeme Moffatt See less
Read more: Plot summary
Director
Producer
Cinematographer
Trending

Become a member to see MOVIEmeter and news information about Over Rusty Rails.

Box Office

Become a member to see Box Office information about Over Rusty Rails.


Release date
Jun 22, 2016 (New Zealand)

Contacts

Become a member to see contact information for Over Rusty Rails.

Cast

+ Add Cast
0 cast members

Contribute to this section by adding a cast member

There was an issue loading this tab.
There was an issue loading this tab.
There was an issue loading this tab.
There was an issue loading this tab.
There was an issue loading this tab.
There was an issue loading this tab.
There was an issue loading this tab.
There was an issue loading this tab.

MOVIEmeter

Members only

Become a member to access additional data

Ratings Breakdown