Day-to-Day Track Maintenance Part II: Switches & Crossings's primary photo
  • Day-to-Day Track Maintenance Part II: Switches & Crossings (1952)
  • Short | 20 min | Documentary, Short
Day-to-Day Track Maintenance Part II: Switches & Crossings (1952)
Short | 20 min | Documentary, Short

Continuing the study of the tasks performed by a 'permanent way gang, this film deals with the maintenance of switches, common crossings and obtuse crossings. These are the fundamental units from which all track layouts, however ...See moreContinuing the study of the tasks performed by a 'permanent way gang, this film deals with the maintenance of switches, common crossings and obtuse crossings. These are the fundamental units from which all track layouts, however complicated, are built up. Written by natgale See less
Read more: Plot summary
Trending

Become a member to see MOVIEmeter and news information about Day-to-Day Track Maintenance Part II: Switches & Crossings.

Status
Edit Released
Updated Dec 31, 1952

Release date
1952 (United Kingdom)

Contacts

Become a member to see contact information for Day-to-Day Track Maintenance Part II: Switches & Crossings.

Cast

+ Add Cast
0 cast members

Contribute to this section by adding a cast member

There was an issue loading this tab.
There was an issue loading this tab.
There was an issue loading this tab.
There was an issue loading this tab.
There was an issue loading this tab.
There was an issue loading this tab.
There was an issue loading this tab.
There was an issue loading this tab.

MOVIEmeter

Members only

Become a member to access additional data

Ratings Breakdown